logo

U.S. Highway 385 Construction and Rock Scaling

Sector: Hydro • Location: South Dakota, United States

Source: KOTA Territory News

Project
Under Construction

Ongoing construction including blasting and rock scaling operations on U.S. Highway 385 between Pactola Dam and Calumet Road, with traffic controlled by flaggers and pilot cars causing delays up to 15 minutes.

Status
Under Construction
Sector
Hydro, Road
Location
South Dakota, United States of America
Updated
22 Jul 2026
Source
KOTA Territory News

ConstructChat

Ask ConstructChat about U.S. Highway 385 Construction and Rock Scaling

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “U.S. Highway 385 Construction and Rock Scaling” is an infrastructure initiative in the Hydro sector, located in South Dakota, United States. Taiyo aggregates data on it from KOTA Territory News.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Ongoing construction including blasting and rock scaling operations on U.S. Highway 385 between Pactola Dam and Calumet Road, with traffic controlled by flaggers and pilot cars causing delays up to 15 minutes.

Original sector

Transportation

Location

Country

United States of America (USA)

State

South Dakota

Source

Source

KOTA Territory News

URL

More Details

Record type

Project

Sector

Hydro, Road

Article published date

2026-05-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project