US LNG Vessel Arrival in Türkiye
Sector: Road • Location: Hatay, Türkiye
Source: Anadolu Ajansı
The LNG vessel, LNG Sakura, is scheduled to arrive in Türkiye on January 31, 2025. It has a capacity of 177,000 cubic meters and is currently en route to the Hatay Dortyol Floating Storage Regasification Unit after departing from Cove Point, US.
- Status
- Prospective
- Sector
- Road, Natural Gas, LNG
- Location
- Hatay, Turkey
- Updated
- 22 Jul 2026
- Source
- Anadolu Ajansı
ConstructChat
Ask ConstructChat about US LNG Vessel Arrival in Türkiye
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The LNG vessel, LNG Sakura, is scheduled to arrive in Türkiye on January 31, 2025. It has a capacity of 177,000 cubic meters and is currently en route to the Hatay Dortyol Floating Storage Regasification Unit after departing from Cove Point, US. |
Original sector | Natural Gas |
Location
Country | Turkey |
State | Hatay |
Source
Source | Anadolu Ajansı |
URL |
More Details
Record type | Project |
Sector | Road, Natural Gas, LNG |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Türkiye
- EARTHQUAKE RECONSTRUCTION FRAMEWORK LOAN
- Golden Horn Waterfront Sports Park And Public Space / Ervin Garip + Banu Garip
- Ataturk Cultural Center / Tabanlioglu Architects
- Izmir Ferries Project
- EQR: Osmaniye Wastewater Treatment
- Netlog Food Supply Chain
- EQR: Osmaniye Wastewater Treatment
- Turk Traktor Green Loan
