logo

U.S. Nuclear Security Enterprise, Texas and Tennessee, USA

Sector: Aerospace & Defense • Location: United States of America

Source: Bechtel

Project
Close

U.S. Nuclear Security Enterprise,Maintaining nuclear and national security The U.S. Department of Energy's (DOE) National Nuclear Security Administration (NNSA) saw an opportunity to streamline two of the nation’s more critical nuclear defense sites: the Y-12 National Security Complex in Tennessee and the Pantex Plant in Texas. By operating these facilities under a consolidated contract the DOE wo

Project Information FAQ

Project Information

5 Q
The project “U.S. Nuclear Security Enterprise, Texas and Tennessee, USA” is an infrastructure initiative in the Aerospace & Defense sector, located in United States of America. Taiyo aggregates data on it from Bechtel.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

U.S. Nuclear Security Enterprise,Maintaining nuclear and national security The U.S. Department of Energy's (DOE) National Nuclear Security Administration (NNSA) saw an opportunity to streamline two of the nation’s more critical nuclear defense sites: the Y-12 National Security Complex in Tennessee and the Pantex Plant in Texas. By operating these facilities under a consolidated contract the DOE would benefit from eliminating duplicate systems and processes, and save money throughout the enterprise to reinvest in upgrading facilities that have been in use since the 1940s and 1950s, respectfully. A Bechtel-led partnership was selected in 2014 to manage and operate the sites under a consolidated contract for the NNSA. The team, Consolidated Nuclear Security LLC (CNS), improved performance at both facilities, while ensuring an uncompromising focus on safety, security, quality, and cost-effectiveness. CNS accomplished this efficiency by implementing shared business systems, innovative solutions, and applying lessons learned. By 2020 the government had validated more than $750 million in cost savings, generating millions to fund site infrastructure improvements implemented by CNS. The funds are being reinvested in much-needed repairs and upgraded infrastructure at Y-12 and Pantex improving the safety and quality of life for employees. The infrastructure transformation at both Y-12 and Pantex has made significant progress including the Uranium Processing Facility (UPF) at Y-12; the John C. Drummond administrative building and High Explosives Pressing Facility at Pantex; and numerous technology demonstration facilities. We have also significantly improved maintenance at both sites, enabling more predictable production performance. NNSA awarded a two-year contract extension to CNS in early 2018. Bechtel's partners in Consolidated Nuclear Security are Leidos, Orbital ATK Inc., and SOC LLC. Booz Allen Hamilton, Inc. is a teaming subcontractor. Image gallery Expanded expertise at Y-12 Y‑12 was the first site in the world to electromagnetically separate uranium on an industrial scale, but that was only the beginning. Since then, the complex has amassed a wealth of uranium know-how: Machining, recycling, and reprocessing Securing and storing Handling and transporting Analyzing and detecting Training others to safeguard uranium Since 1994, the site has been involved in 16 international missions to recover nuclear materials, including in France, Italy, and Canada in 2013 and Belgium and South Korea in 2014. The team at Y-12 is responsible for: Safely and securely storing uranium Processing and manufacturing special materials vital to national security Supplying highly enriched uranium for U.S. Navy nuclear-powered aircraft carriers and submarines (the very vessels whose power plants derive from the Bettis and Knolls atomic laboratories that Bechtel manages for NNSA and the U.S. Navy)  Conducting tests and training as well as decommissioning weapons to help prevent the spread of weapons of mass destruction Upgrading to further the mission The new Uranium Processing Facility is now under construction and will replace aging facilities in use since World War II. When complete, the largest construction project in Tennessee history will house enriched uranium operations, including assembly, disassembly, quality evaluation, metalworking, and product certification. The state-of-the-art building will replace several aging facilities at the Y-12 complex—using less space and benefiting from improved security and technologies. Pantex and Y-12 play key roles maintaining the safety, security, and effectiveness of the U.S. nuclear weapons stockpile, missions vital to national and global security. Pantex For decades, Pantex has provided technology for the manufacturing, evaluation, and testing of nuclear explosives, joint test beds, and other special nuclear materials. This experience uniquely qualifies Pantex scientists and engineers to provide technology solutions for a variety of problems. The Bechtel-led plant has organizations dedicated to computerized special tooling, test equipment (including critical nuclear explosive testers), packaging, and system engineering. Pantex is also responsible for: Carrying out nuclear weapons life-extension programs Dismantling and disposing of retired weapons systems Surveilling active weapons systems Developing, testing, and fabricating high-explosives components Storing and surveilling plutonium pits, the cores at the heart of thermonuclear weapons New infrastructure increasing safety and production In addition to continuing the DOE’s mission to capture savings while upgraded aging facilities, Bechtel was able to negotiate the contract which brought Pantex employees its first upgraded administrative building since the plant was constructed over seven decades ago. The award-winning, 348,000-square-foot John C. Drummond Center (JCDC) was completed in 2018. The $115 million high-security facility relocates employees from its aging facilities into a modern, energy-efficient (LEED Gold) facility where employees can safely continue the mission of the NNSA. In additon to the JCDC, the High Explosives Pressing Facility became operational. The new facility consolidates operations at half a dozen aging Pantex buildings under one roof. The facility greatly reduces the movement of high explosives at Pantex, increasing safety and aiding production, as high explosives moves can restrict other Plant operations.  

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data