U.S. Route 250 Multi-Purpose Pathway
Sector: Road • Location: Ashland, Ohio, United States
Source: Ashland County Pictures
City Council approved bids for a new multi-purpose pathway along U.S. Route 250 between U.S. 42 and I-71. The project includes an 11-foot paved pathway on the south side and a six-foot paved path on the north side to improve pedestrian safety in a busy retail corridor. The city received about $1.5 million in ODOT grant funding and $175,000 from the state, with no expected local cost.
- Status
- Prospective
- Sector
- Road
- Location
- Ashland, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Ashland County Pictures
ConstructChat
Ask ConstructChat about U.S. Route 250 Multi-Purpose Pathway
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | City Council approved bids for a new multi-purpose pathway along U.S. Route 250 between U.S. 42 and I-71. The project includes an 11-foot paved pathway on the south side and a six-foot paved path on the north side to improve pedestrian safety in a busy retail corridor. The city received about $1.5 million in ODOT grant funding and $175,000 from the state, with no expected local cost. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Ashland |
Source
Source | Ashland County Pictures |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-05-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
