US Route 9W at Oak Tree Road Improvements
Sector: Road • Location: Orangetown, New York, United States
Source: Rockland County Business Journal
The project aims to improve the intersection of US Route 9W and Oak Tree Road by replacing the existing signalized intersection with a modern single-lane roundabout, enhancing safety and accessibility for all users.
- Status
- Prospective
- Sector
- Road
- Location
- Orangetown, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Rockland County Business Journal
ConstructChat
Ask ConstructChat about US Route 9W at Oak Tree Road Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project aims to improve the intersection of US Route 9W and Oak Tree Road by replacing the existing signalized intersection with a modern single-lane roundabout, enhancing safety and accessibility for all users. |
Location
Country | United States of America (USA) |
State | New York |
City | Orangetown |
Source
Source | Rockland County Business Journal |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2025-04-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
