U.S. STREAM Data Centers Project at STAMP
Sector: Manufacturing (Industrial) • Location: Alabama, New York, United States
Source: The Batavian
U.S. STREAM Data Centers has proposed a $19.46 billion data center project at the Western New York Science & Technology Advanced Manufacturing Park (STAMP) in Alabama, New York. The project involves the development of a large-scale data center facility with a proposed size of up to 2.2 million square feet, within zoning allowances of up to 6.1 or 6.2 million square feet at STAMP. The project is ex
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Data Center
- Location
- Alabama, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- The Batavian
ConstructChat
Ask ConstructChat about U.S. STREAM Data Centers Project at STAMP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | proposed |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | U.S. STREAM Data Centers has proposed a $19.46 billion data center project at the Western New York Science & Technology Advanced Manufacturing Park (STAMP) in Alabama, New York. The project involves the development of a large-scale data center facility with a proposed size of up to 2.2 million square feet, within zoning allowances of up to 6.1 or 6.2 million square feet at STAMP. The project is expected to create approximately 125 jobs, significantly fewer than the originally anticipated 9,000 jobs for advanced manufacturing at the site. The project is under review by the Town Board, Planning Board, and Genesee County Industrial Development Agency, with public hearings and environmental reviews ongoing. |
Original sector | Built Sector |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Alabama |
Source
Source | The Batavian |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Data Center |
Article published date | 2026-04-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
