logo
ProjectCommitted And Under Construction

US Utilities Large-Load Capacity Growth

One of 10,000+ projects Taiyo tracks in United States.

Source: SolarQuarter

A Wood Mackenzie study reveals that U.S. utilities have committed or are constructing 116 GW of large load capacity, equivalent to 15.5% of the current national peak electricity demand. Including projects under advanced discussion, the total reaches 147 GW or 20% of peak demand. Much of this capacity is expected to come online within this decade, with about 60 GW projected to be added by 2030 and

Status
Under Construction
Sector
Power Generation (CCGT), Data Center
Location
United States of America
Updated
22 Jul 2026
Source
SolarQuarter

ConstructChat

Ask ConstructChat about US Utilities Large-Load Capacity Growth

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “US Utilities Large-Load Capacity Growth” is an infrastructure initiative in the Power Generation (CCGT) sector, located in United States. Taiyo aggregates data on it from SolarQuarter.

Participants

Not available for this record.

Status

Original status

committed and under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A Wood Mackenzie study reveals that U.S. utilities have committed or are constructing 116 GW of large load capacity, equivalent to 15.5% of the current national peak electricity demand. Including projects under advanced discussion, the total reaches 147 GW or 20% of peak demand. Much of this capacity is expected to come online within this decade, with about 60 GW projected to be added by 2030 and 93 GW operational by 2035. The study highlights a shift in project locations, with most current construction in regulated markets, but a growing presence in deregulated markets, especially ERCOT and PJM, which carries risks of supply shortfalls and price increases. The report also notes pipeline certainty is declining due to data center projects and other factors.

Original sector

Energy

Location

Country

United States of America (USA)

Source

Source

SolarQuarter

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Data Center

Article published date

2025-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project