A Wood Mackenzie study reveals that U.S. utilities have committed or are constructing 116 GW of large load capacity, equivalent to 15.5% of the current national peak electricity demand. Including projects under advanced discussion, the total reaches 147 GW or 20% of peak demand. Much of this capacity is expected to come online within this decade, with about 60 GW projected to be added by 2030 and

Project Information FAQ

Project Information

3 Q
The project “US Utilities Large-Load Capacity Growth” is an infrastructure initiative in the Power Generation (CCGT) sector, located in United States. Taiyo aggregates data on it from SolarQuarter.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

committed and under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A Wood Mackenzie study reveals that U.S. utilities have committed or are constructing 116 GW of large load capacity, equivalent to 15.5% of the current national peak electricity demand. Including projects under advanced discussion, the total reaches 147 GW or 20% of peak demand. Much of this capacity is expected to come online within this decade, with about 60 GW projected to be added by 2030 and 93 GW operational by 2035. The study highlights a shift in project locations, with most current construction in regulated markets, but a growing presence in deregulated markets, especially ERCOT and PJM, which carries risks of supply shortfalls and price increases. The report also notes pipeline certainty is declining due to data center projects and other factors.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data