logo
ProjectClosed

USDA Wastewater System Improvements - Collection System

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Sewer Collection System improvements include 685 feet of new gravity sewer main to be installed on Pine Tree Street, as well as 1,150 feet of new forcemain installed on Mill Street. There will be 2,790 feet of full-length lining of gravity main in poor condition, as well as 2 Sanitary Sewer Structures in poor condition that will receive improvements. Restoration work includes asphalt paving, concr

Status
Closed
Sector
Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial, Manufacturing (Industrial)
Location
Farwell, Michigan, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about USDA Wastewater System Improvements - Collection System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “USDA Wastewater System Improvements - Collection System” is an infrastructure initiative in the Water Supply and Storage sector, located in Farwell, Michigan, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Sewer Collection System improvements include 685 feet of new gravity sewer main to be installed on Pine Tree Street, as well as 1,150 feet of new forcemain installed on Mill Street. There will be 2,790 feet of full-length lining of gravity main in poor condition, as well as 2 Sanitary Sewer Structures in poor condition that will receive improvements. Restoration work includes asphalt paving, concrete sidewalk and ramps, gravel driveways, curb and gutter replacement, topsoil and seeding and al...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Michigan

City

Farwell

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial, Manufacturing (Industrial)

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project