USPS (Anaheim, CA)
Closed · California · Last reported Jul 2024
Source: Dodge USA
Scope Includes:1. Electrical Upgrades for Charger Installationa. Facility electrical will be upgraded to accommodate two (2) Rexel USAInc/Chargepoint CP6011B-80A-L7 single port, pedestal, 19.2kW chargers with a23' cable length. Electrical Vehicle Supply Equipment (EVSE) USPS Kit NumberCP001.b. To support the facilities electrical requirements, two (2) new single phase 25 KVA480V/240 transformers a
- Status
- Closed
- Sector
- Automotive, Electric Vehicles (EVs), Car parking, Power Generation (CCGT), Seaport, Telecommunications, Residential, Commercial, Consumer Products, Government, Manufacturing (Industrial)
- Location
- Anaheim, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about USPS (Anaheim, CA)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope Includes:1. Electrical Upgrades for Charger Installationa. Facility electrical will be upgraded to accommodate two (2) Rexel USAInc/Chargepoint CP6011B-80A-L7 single port, pedestal, 19.2kW chargers with a23' cable length. Electrical Vehicle Supply Equipment (EVSE) USPS Kit NumberCP001.b. To support the facilities electrical requirements, two (2) new single phase 25 KVA480V/240 transformers and two (2) new dedicated electric panels will be installedin the parking area southeast of the Ve... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Anaheim |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Electric Vehicles (EVs), Car parking, Power Generation (CCGT), Seaport, Telecommunications, Residential, Commercial, Consumer Products, Government, Manufacturing (Industrial) |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
