logo

USPS Annapolis SDC R&A and EV Phase 2

Sector: Commercial • Location: Annapolis, Maryland, United States of America

Source: Dodge USA

Project
Bid Results

Phase 2 of the USPS Annapolis SDC R&A and EV project. Scope of work is not limited to: Drywall, Painting, Structural metals, Impact doors, doors, cabinets, new roof canopy, Electrical Feeds to support over 100 EVS Stations in the parking lot. Asphalt and concrete demolition and expanding the parking. Site work needed. New retaining wall and new side walk.

Status
Closed
Sector
Commercial, Metal, Cement, Electric Vehicles (EVs), Power Generation (CCGT), Residential, Car parking, Road, Automotive, Manufacturing (Industrial)
Location
Annapolis, Maryland, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about USPS Annapolis SDC R&A and EV Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “USPS Annapolis SDC R&A and EV Phase 2” is an infrastructure initiative in the Commercial sector, located in Annapolis, Maryland, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Phase 2 of the USPS Annapolis SDC R&A and EV project. Scope of work is not limited to: Drywall, Painting, Structural metals, Impact doors, doors, cabinets, new roof canopy, Electrical Feeds to support over 100 EVS Stations in the parking lot. Asphalt and concrete demolition and expanding the parking. Site work needed. New retaining wall and new side walk.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Maryland

City

Annapolis

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Metal, Cement, Electric Vehicles (EVs), Power Generation (CCGT), Residential, Car parking, Road, Automotive, Manufacturing (Industrial)

Article published date

2024-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project