UT/DOT: I-70 Box Beam Replacement Phase 3
Sector: Bridge • Location: Richfield, Utah, United States of America
Source: Dodge USA
Project Location: I-70; Box Beam Replacement Phase 3 The principal items of work are as follows (for all items of work see attachment): Cast-In-Place Concrete Constant Slope Barrier, 42 Inch - TL-5 Cast-In-Place Concrete Constant Slope Barrier, 42 Inch - TL-5 HMA - 1/2 inch
- Status
- Closed
- Sector
- Bridge, Cement, Road, Mass Transit, Rail, Commercial
- Location
- Richfield, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about UT/DOT: I-70 Box Beam Replacement Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project Location: I-70; Box Beam Replacement Phase 3 The principal items of work are as follows (for all items of work see attachment): Cast-In-Place Concrete Constant Slope Barrier, 42 Inch - TL-5 Cast-In-Place Concrete Constant Slope Barrier, 42 Inch - TL-5 HMA - 1/2 inch |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Richfield |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Cement, Road, Mass Transit, Rail, Commercial |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- Centennial Bridge
- Claflin University Connecting Minority Community Project
- ConnectMaine Authority Statewide Broadband Infrastructure Application 2021
- White Earth NTIA Broadband – White Earth Reservation
- Tri-State Fiber Deployment Project (TSFDP)
- OLLU Connecting Minority Communities Pilot
- Strengthening Broadband Capacity to Amplify Educational Opportunities and Foster Digital Inclusion in Rural and Underserved Communities
- Connecting Minds & Technology: Enhancing Cross-Campus Digital Literacy with Hands-on Initiatives (CMT)
