UT/DOT: Manila Culvert Replacement
Sector: Water Supply and Storage • Location: Manila, Utah, United States of America
Source: Dodge USA
The purpose of this IFB is to enter into a contract with the lowest responsive and responsible bidder to provide construction services related to the install 48 RCP Culvert at an estimated depth of 7 feet below top of asphalt elevation, abandon in place existing 30 inch culvert and place flowable fill in culvert, cast in place two concrete headwalls with aprons per UDOT Structure Standard drawing
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The purpose of this IFB is to enter into a contract with the lowest responsive and responsible bidder to provide construction services related to the install 48 RCP Culvert at an estimated depth of 7 feet below top of asphalt elevation, abandon in place existing 30 inch culvert and place flowable fill in culvert, cast in place two concrete headwalls with aprons per UDOT Structure Standard drawing WS- 101A and WS- 102A, Roadway excavation, 6 inch thick HMA- , 8 inch thick Untreated base course... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
