logo

UT/DOT: River Road Bridge Replacement

Sector: Bridge • Location: Duchesne, Utah, United States of America

Source: Dodge USA

Project
Closed

River Road Bridge Replacement #013053F The principal items of work are as follows (for all items of work see attachment): Prestressed Concrete Member 106 ft 6 inch Type UBT50 Drilled Shafts, 30 inch Structural Concrete Est. Lump Qty: 170 cu yd

Status
Closed
Sector
Bridge, Cement, Road, Commercial
Location
Duchesne, Utah, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about UT/DOT: River Road Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “UT/DOT: River Road Bridge Replacement” is an infrastructure initiative in the Bridge sector, located in Duchesne, Utah, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

River Road Bridge Replacement #013053F The principal items of work are as follows (for all items of work see attachment): Prestressed Concrete Member 106 ft 6 inch Type UBT50 Drilled Shafts, 30 inch Structural Concrete Est. Lump Qty: 170 cu yd

Procurement method

Budget

Location

Country

United States of America (USA)

State

Utah

City

Duchesne

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Cement, Road, Commercial

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project