logo
ProjectClosed

UT/DOT: SR-143 Slope Stabilization Phase 2

Closed · Utah · Last reported Dec 2023

Source: Dodge USA

SR-143; Slope Stabilization & Flood Rep Phase 2 SR-143; MP 9.75 - 12.35 The principal items of work are as follows (for all items of work see attachment): Wire Face MSE Reinforced Fill Slope

Status
Closed
Sector
Commercial, Water Supply and Storage, Waste Processing and Treatment, Metal
Location
Parowan, Utah, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about UT/DOT: SR-143 Slope Stabilization Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “UT/DOT: SR-143 Slope Stabilization Phase 2” is an infrastructure initiative in the Commercial sector, located in Parowan, Utah, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

SR-143; Slope Stabilization & Flood Rep Phase 2 SR-143; MP 9.75 - 12.35 The principal items of work are as follows (for all items of work see attachment): Wire Face MSE Reinforced Fill Slope

Procurement method

Budget

Location

Country

United States of America (USA)

State

Utah

City

Parowan

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Waste Processing and Treatment, Metal

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project