UT/DOT: Storm Drain Improvements - Ph 2
One of 10,000+ projects Taiyo tracks in Utah.
Source: Dodge USA
The Work consists of the following: Demolition of existing asphalt evaporative pond. Construction of a new concrete evaporative pond with leak detection systems, geomembrane liners and walls. Construction of brine tank concrete pads for two (2) 5,000-gallon brine tanks, concrete pavement along the south side of the evaporative pond. Install of 6-foot fence around the pond and bollards along west s
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Consumer Products, Raw Materials
- Location
- Willard, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about UT/DOT: Storm Drain Improvements - Ph 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work consists of the following: Demolition of existing asphalt evaporative pond. Construction of a new concrete evaporative pond with leak detection systems, geomembrane liners and walls. Construction of brine tank concrete pads for two (2) 5,000-gallon brine tanks, concrete pavement along the south side of the evaporative pond. Install of 6-foot fence around the pond and bollards along west side of pond for protection. Miscellaneous swales and grading work around the new pond. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Willard |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Consumer Products, Raw Materials |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
