logo

UT/DOT: Winchester and 700 West Intersection Modification

Sector: Cement • Location: Murray, Utah, United States of America

Source: Dodge USA

Project
Closed

Project Location: Winchester and 700 West The principal items of work are as follows (for all items of work see attachment): Portland Cement Concrete Pavement 8 inch Thick Mobilization Traffic Control

Status
Closed
Sector
Cement, Manufacturing (Industrial), Road, Commercial
Location
Murray, Utah, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about UT/DOT: Winchester and 700 West Intersection Modification

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “UT/DOT: Winchester and 700 West Intersection Modification” is an infrastructure initiative in the Cement sector, located in Murray, Utah, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project Location: Winchester and 700 West The principal items of work are as follows (for all items of work see attachment): Portland Cement Concrete Pavement 8 inch Thick Mobilization Traffic Control

Procurement method

Budget

Location

Country

United States of America (USA)

State

Utah

City

Murray

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Cement, Manufacturing (Industrial), Road, Commercial

Article published date

2024-10-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project