UTE São Martinho Bioenergia
Sector: Geothermal • Location: Sao Paulo, Brazil
Source: World Bank Group
UTE São Martinho Bioenergia is located inside the industrial complex in Pradópolis, São Paulo. The thermal power plant will be fueled by sugarcane bagasse.
São Martinho group is developing the project.
Total project cost is estimated to be 70 USDm. BNDES provided 300 BRLm (56 USDm) financing line corresponding to 79% of the total investment. Financial Closure was achieved in January 2021.
The t
- Status
- Prospective
- Sector
- Geothermal, Manufacturing (Industrial), Power Generation (CCGT), Commercial, Government
- Location
- Sao Paulo, Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about UTE São Martinho Bioenergia
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | UTE São Martinho Bioenergia is located inside the industrial complex in Pradópolis, São Paulo. The thermal power plant will be fueled by sugarcane bagasse. São Martinho group is developing the project. Total project cost is estimated to be 70 USDm. BNDES provided 300 BRLm (56 USDm) financing line corresponding to 79% of the total investment. Financial Closure was achieved in January 2021. The thermal power plant will have generation capacity of around 210,000 MWh, of which 177,000 MWh have already been contracted for 25 years through the A-6 auction held in October 2019. It should be fully implemented by 2026. https://www.saomartinho.com.br/show.aspx?idMateria=4GXkzZml+EcNWhrfIltBkQ==&linguagem=en https://www.empreenderemgoias.com.br/2021/01/21/sao-martinho-vai-investir-r-640-mi-em-quirinopolis/ |
Original sector | Energy |
Budget |
Location
Country | Brazil |
State | Sao Paulo |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Geothermal, Manufacturing (Industrial), Power Generation (CCGT), Commercial, Government |
Article published date | 2024-05-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
