UTHS West Parking Lot Improvements - Phase 2
Sector: Water Supply and Storage • Location: East Moline, Illinois, United States of America
Source: Dodge
Mill and overlay of existing pavement at the parking lot on the west side of the United Township High School (UTHS) campus, the existing pavement will be repaired as needed to fix grading or drainage issues and then milled and overlaid with new asphalt. Concrete improvements on north drainage pan, site lighting, and signage.
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Government, Car parking, Commercial, Waste Processing and Treatment, Road, Manufacturing (Industrial), Automotive
- Location
- East Moline, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about UTHS West Parking Lot Improvements - Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Mill and overlay of existing pavement at the parking lot on the west side of the United Township High School (UTHS) campus, the existing pavement will be repaired as needed to fix grading or drainage issues and then milled and overlaid with new asphalt. Concrete improvements on north drainage pan, site lighting, and signage. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | East Moline |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Car parking, Commercial, Waste Processing and Treatment, Road, Manufacturing (Industrial), Automotive |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
