Utila Power Company

Sector: Water Supply and Storage • Location: Honduras

Source: World Bank Group

Project
Active

Utila Power Company (UPCO), comprising Tennessee Valley Infrastructure Group Inc. (22 percent) and other United States and Honduran investors (78 percent), was awarded a 25-year contract to generate and distribute power for the island of Utila. UPCO assumed control of the transmission and distribution system operated by the Honduran Empresa Nacional de Energia Electrica (Enee). The US and Honduran

Project Information FAQ

Project Information

5 Q
The project “Utila Power Company” is an infrastructure initiative in the Water Supply and Storage sector, located in Honduras. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Utila Power Company (UPCO), comprising Tennessee Valley Infrastructure Group Inc. (22 percent) and other United States and Honduran investors (78 percent), was awarded a 25-year contract to generate and distribute power for the island of Utila. UPCO assumed control of the transmission and distribution system operated by the Honduran Empresa Nacional de Energia Electrica (Enee). The US and Honduran investors comprise individuals or firms with small shares of UPCO. Estimated investment was US$3.8 million and consists of debt equity financing. US$1.89 million debt financing was provided by Banco Grupo El Ahorro Hondureno and the Central American Bank for Economic Integration (CABEI). The remaining investment was equity financed. Construction of the first phase included an integrated infrastructure platform consisting of generation facilities, pre-paid power metering and water purification units. Upon completion of the first phase, UPCO was expected to provide island residents with 24-hour power service. The project also includes desalination units to produce potable water (50,000 liters/day). Construction completion was expected in April 2004 and was expected to double the number of customers to more than 900. The second phase includes the installation of wind turbines.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data