Utilities-Power Plant-Station Power Improvements-Phase 5
One of 10,000+ projects Taiyo tracks in Iowa.
Source: Dodge USA
This project consists of installing four (4) new 15kV 480 Volt electrical distribution substations in the Power Plant, including switchgear, circuit breakers, and transformers, along with new Motor Control Centers (MCCs), and the required 15kV feeders from the existing Power Plant Vac-Clad 15kV switchgear and existing 15kV Power Plant DHP switchgear. This new equipment will replace existing obsole
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Commercial, Power Transmission
- Location
- Ames, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Utilities-Power Plant-Station Power Improvements-Phase 5
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of installing four (4) new 15kV 480 Volt electrical distribution substations in the Power Plant, including switchgear, circuit breakers, and transformers, along with new Motor Control Centers (MCCs), and the required 15kV feeders from the existing Power Plant Vac-Clad 15kV switchgear and existing 15kV Power Plant DHP switchgear. This new equipment will replace existing obsolete electrical equipment. Questions regarding the scope of work should be directed to the Design P... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Ames |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Power Transmission |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
