logo
ProjectGc Bidding

Utilities-Power Plant-Station Power Improvements-Phase 5

One of 10,000+ projects Taiyo tracks in Iowa.

Source: Dodge USA

This project consists of installing four (4) new 15kV 480 Volt electrical distribution substations in the Power Plant, including switchgear, circuit breakers, and transformers, along with new Motor Control Centers (MCCs), and the required 15kV feeders from the existing Power Plant Vac-Clad 15kV switchgear and existing 15kV Power Plant DHP switchgear. This new equipment will replace existing obsole

Status
Under Construction
Sector
Power Generation (CCGT), Commercial, Power Transmission
Location
Ames, Iowa, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Utilities-Power Plant-Station Power Improvements-Phase 5

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Utilities-Power Plant-Station Power Improvements-Phase 5” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Ames, Iowa, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

GC Bidding

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project consists of installing four (4) new 15kV 480 Volt electrical distribution substations in the Power Plant, including switchgear, circuit breakers, and transformers, along with new Motor Control Centers (MCCs), and the required 15kV feeders from the existing Power Plant Vac-Clad 15kV switchgear and existing 15kV Power Plant DHP switchgear. This new equipment will replace existing obsolete electrical equipment. Questions regarding the scope of work should be directed to the Design P...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Iowa

City

Ames

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Power Transmission

Article published date

2024-12-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project