Utility Bldg Maintenance Garage & Exterior Rehabilitation
Closed · Massachusetts · Last reported Jan 2025
Source: Dodge
THE WORK CONSISTS OF: Furnish all labor, equipment, and materials necessary to renovate, repair, and rehabilitate the exterior of two buildings at the Birch Hill Dam Project. The two buildings are referred to as the Utility Building and the Maintenance Garage. Due to the age of the buildings, it is a requirement of the contract that the Contractor test the Utility Building and Maintenance garage f
- Status
- Closed
- Sector
- Hydro, Commercial, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial), Water Supply and Storage, Car parking, Automotive
- Location
- Royalston, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Utility Bldg Maintenance Garage & Exterior Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | THE WORK CONSISTS OF: Furnish all labor, equipment, and materials necessary to renovate, repair, and rehabilitate the exterior of two buildings at the Birch Hill Dam Project. The two buildings are referred to as the Utility Building and the Maintenance Garage. Due to the age of the buildings, it is a requirement of the contract that the Contractor test the Utility Building and Maintenance garage for asbestos containing material (ACM) and Polychlorinated Biphenyls (PCBs) only in areas impacted... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Royalston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Hydro, Commercial, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial), Water Supply and Storage, Car parking, Automotive |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in United States of America
- Clearlake Affordable Housing Project
- NEW SAVANNAH BLUFF LOCK & DAM REPAIR & RESTORATION - TIA
- INSTALL RCUT AT SR 515 & SR 325 (NOTELY DAM RD)
- Wichita & Affiliated Tribes Broadband Infrastructure Deployment Project and Broadband Use and Adoption Project
- Renovation of the potable water piping and distribution system from the Añarbe Dam to the Petritegi DWTP in Huesca (Spain)
- Antelope Creek Juvenile Fish Passage Improvement
- Removal of Centreville Dam, Centreville, MD: Hurricane Sandy Disaster Relief, DOI Proj MD089
- Environmental System Science (ESS)
