Utility Energy Services Contract SOURCES SOUGHT
Pre-design · Illinois · Last reported Jul 2024
Source: Dodge USA
The requirement is for the 88th Readiness Division, Chicago, IL. We are SEEKING SOURCES. These UESCs will minimize energy consumption and costs while meeting operation and mission requirements with potential energy and water saving projects, including but not limited to lighting upgrades; heating, ventilating, and air-conditioning; solar photovoltaic array / parking lot PV carports / batter energy
- Status
- Prospective
- Sector
- Power Transmission, Water Supply and Storage, Solar, Energy Storage, Car parking, Automotive, Commercial, Power Generation (CCGT)
- Location
- Chicago, Illinois, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Utility Energy Services Contract SOURCES SOUGHT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The requirement is for the 88th Readiness Division, Chicago, IL. We are SEEKING SOURCES. These UESCs will minimize energy consumption and costs while meeting operation and mission requirements with potential energy and water saving projects, including but not limited to lighting upgrades; heating, ventilating, and air-conditioning; solar photovoltaic array / parking lot PV carports / batter energy storage systems / generation, energy management control systems upgrades, water efficiency (plum... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Chicago |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Water Supply and Storage, Solar, Energy Storage, Car parking, Automotive, Commercial, Power Generation (CCGT) |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
