Utility Improvements - Serve Trailstone Ph 7
Sector: Water Supply and Storage • Location: Carrollton, Texas, United States of America
Source: Dodge USA
Scope - scope shall include the Utility Improvements, approximately 6,867 LF of 8-12 onsite water, 9,675 LF of 8-12 onsite sanitary sewer, and 6,103 LF of 6 x 4 RCB through 18 RCP storm sewer, all per NCTCOG, Construction Plans, and City of Caddo Mills specifications, to serve 211 lots on approximately54.483 acres. The project is located East and North of the intersection of F.M.36 & F.M.
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Mass Transit, Government, Rail, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Carrollton, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Utility Improvements - Serve Trailstone Ph 7
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - scope shall include the Utility Improvements, approximately 6,867 LF of 8-12 onsite water, 9,675 LF of 8-12 onsite sanitary sewer, and 6,103 LF of 6 x 4 RCB through 18 RCP storm sewer, all per NCTCOG, Construction Plans, and City of Caddo Mills specifications, to serve 211 lots on approximately54.483 acres. The project is located East and North of the intersection of F.M.36 & F.M. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Carrollton |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Mass Transit, Government, Rail, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
