Utility Infrastructure Public Private Partnership
Closed · Kentucky · Last reported Sep 2024
Source: Dodge USA
The University of Kentucky (UK) is pleased to present this Request for Proposal (RFP) for qualified individuals, firms, and teams with extensive experience in developing, financing, constructing, implementing, operating, and maintaining campus energy infrastructure. The primary components of the core project are the additional heating and cooling capacity required to support the UK Campus, includi
- Status
- Closed
- Sector
- Energy Storage, Geothermal, Education, Power Transmission, Hospital, Hotel, Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- Lexington, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Utility Infrastructure Public Private Partnership
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The University of Kentucky (UK) is pleased to present this Request for Proposal (RFP) for qualified individuals, firms, and teams with extensive experience in developing, financing, constructing, implementing, operating, and maintaining campus energy infrastructure. The primary components of the core project are the additional heating and cooling capacity required to support the UK Campus, including the new Chandler Expansion hospital, new thermal energy distribution, and other enabling utili... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Lexington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Geothermal, Education, Power Transmission, Hospital, Hotel, Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 14 KW 35 MODULES AND 1 BATTERY 13.5 KWH ESS
- INSTALL (141) TESLA SOLAR ROOF TILES AT 10.152 KW TOTAL. INS TALL (13.5) KWH ENERGY STORAGE SYSTEM AND (N) LOAD CENTER
- 10' SUSPENDED WIRE PERIMETER SECRURITY SYSTEM INSIDE FENCE, BATTERY OPERATED LOW VOLTAGE
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 4.32 KW 12 MODULES AND INSTALL BACK-UP BATTERY 10.5 KWH, EQUIP. ON ENGINEERED FENCE
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 4.2 KW 12 MODULES 1 LG CHEM BATTERY 9.5 KWH
- REMOVE & REPLACE ANTENNAS, RRUS, BATTERY UNIT
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 10.8 KW 27 PANELS 1 NEW TESLA BATTERY NEW 100 AMP SOLAR PANEL
- PHASE 3-DATA CENTER- ENCOMPASSING OF PART OF 3RD FLOOR AHU ELECTRICAL ROOM,BATTERY ROOM,INSALL GENERATORS&EQUIP IN YARD
