Utility Locating Services Contract
Sector: Water Supply and Storage • Location: Jupiter, Florida, United States of America
Source: Dodge USA
To provide utility locating services for the following buried utilities: potable water transmission and distribution mains (approx. 479 miles) located within the Town s water service area; potable water transfer mains (approx. 0.47 miles) located between the water treatment plant and ground storage tanks; raw water transmission mains (approx. 19.5 miles) located between well sites and the water tr
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Consumer Products, Raw Materials, Commercial, Power Generation (CCGT), Power Transmission
- Location
- Jupiter, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Utility Locating Services Contract
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | To provide utility locating services for the following buried utilities: potable water transmission and distribution mains (approx. 479 miles) located within the Town s water service area; potable water transfer mains (approx. 0.47 miles) located between the water treatment plant and ground storage tanks; raw water transmission mains (approx. 19.5 miles) located between well sites and the water treatment plant; electrical distribution lines (approx. 8.5 miles) located between electrical/gener... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Jupiter |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Consumer Products, Raw Materials, Commercial, Power Generation (CCGT), Power Transmission |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
