Utility Powered ISCO Flowmeters & Integration SCADA System
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Utility Powered ISCO Flowmeters and Integration with SCADA System. Nature and scope of work: Convert battery powered flowmeters at four separate combined sewer overflow locations throughout the City of Cambridge with utility powered flow meters, including new buried concrete encased electrical conduit, new electrical pedestal cabinets, SCADA and electrical service upgrades, demolition and proper d
- Status
- Prospective
- Sector
- Water Supply and Storage, Energy Storage, Power Generation (CCGT), Waste Processing and Treatment, Cement, Government, Power Transmission, Commercial
- Location
- Cambridge, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Utility Powered ISCO Flowmeters & Integration SCADA System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Utility Powered ISCO Flowmeters and Integration with SCADA System. Nature and scope of work: Convert battery powered flowmeters at four separate combined sewer overflow locations throughout the City of Cambridge with utility powered flow meters, including new buried concrete encased electrical conduit, new electrical pedestal cabinets, SCADA and electrical service upgrades, demolition and proper disposal of existing cabinets, repairing trenches and site restoration, traffic controls, permitti... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Cambridge |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Energy Storage, Power Generation (CCGT), Waste Processing and Treatment, Cement, Government, Power Transmission, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
