Utility Powered ISCO Flowmeters & Integration SCADA System
Closed · Massachusetts · Last reported Jul 2025
Source: Dodge
Utility Powered ISCO Flowmeters and Integration with SCADA System. Nature and scope of work: Convert battery powered flowmeters at four separate combined sewer overflow locations throughout the City of Cambridge with utility powered flow meters, including new buried concrete encased electrical conduit, new electrical pedestal cabinets, SCADA and electrical service upgrades, demolition and proper d
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Energy Storage, Power Generation (CCGT), Power Transmission, Commercial, Cement, Government
- Location
- Cambridge, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Utility Powered ISCO Flowmeters & Integration SCADA System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Utility Powered ISCO Flowmeters and Integration with SCADA System. Nature and scope of work: Convert battery powered flowmeters at four separate combined sewer overflow locations throughout the City of Cambridge with utility powered flow meters, including new buried concrete encased electrical conduit, new electrical pedestal cabinets, SCADA and electrical service upgrades, demolition and proper disposal of existing cabinets, repairing trenches and site restoration, traffic controls, permitti... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Cambridge |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Energy Storage, Power Generation (CCGT), Power Transmission, Commercial, Cement, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
