Utility Tunnel Repair Ph 2
Sector: Cement • Location: Pocatello, Idaho, United States of America
Source: Dodge
The steam and condensate lines in the utility tunnel system on the ISU Campus in Pocatello need to be replaced along with the tunnels. The project phases will replace sections of the 60-year-old and heavily corroded steam and condensate lines, insulation, steam valves, and steam specialties. The 80+ year old tunnel structure is also in need of replacement due to deterioration of the concrete. This
- Status
- Closed
- Sector
- Cement, Tunnel, Road, Power Transmission, Power Generation (CCGT), Commercial
- Location
- Pocatello, Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Utility Tunnel Repair Ph 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The steam and condensate lines in the utility tunnel system on the ISU Campus in Pocatello need to be replaced along with the tunnels. The project phases will replace sections of the 60-year-old and heavily corroded steam and condensate lines, insulation, steam valves, and steam specialties. The 80+ year old tunnel structure is also in need of replacement due to deterioration of the concrete. This phase will replace about 350 feet of tunnel lid, floors, walls and access hatches. New Communica... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Idaho |
City | Pocatello |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Tunnel, Road, Power Transmission, Power Generation (CCGT), Commercial |
Article published date | 2025-08-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
