UTM Offshore Floating LNG Terminal
Sector: Natural Gas • Location: Nigeria
Source: GlobeNewswire
UTM Offshore received its License to Construct in September 2024 for a floating LNG terminal in Nigeria. The facility's approved capacity was upgraded to 2.8 MTPA, designed to process 324 million standard cubic feet per day of natural gas and produce 500,000 tons of LPG annually for domestic use. The project cost is estimated at USD 5 billion, with commissioning scheduled for 2028.
- Status
- Prospective
- Sector
- Natural Gas, LNG
- Location
- Nigeria
- Updated
- 22 Jul 2026
- Source
- GlobeNewswire
ConstructChat
Ask ConstructChat about UTM Offshore Floating LNG Terminal
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | UTM Offshore received its License to Construct in September 2024 for a floating LNG terminal in Nigeria. The facility's approved capacity was upgraded to 2.8 MTPA, designed to process 324 million standard cubic feet per day of natural gas and produce 500,000 tons of LPG annually for domestic use. The project cost is estimated at USD 5 billion, with commissioning scheduled for 2028. |
Original sector | Energy |
Budget |
Location
Country | Nigeria |
Source
Source | GlobeNewswire |
URL |
More Details
Record type | Project |
Sector | Natural Gas, LNG |
Article published date | 2025-11-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
