logo
ProjectConstruction Documents

Utoy Creek Influent Pump Station Replacement

Construction documents · Georgia · Last reported Aug 2025

Source: Dodge

Utoy Creek Influent Pump Station: Project consists of replacement of the two existing 4 million gallons (MGD) pumps with two 7.5 MGD pumps. The pump station capacity upgrade is a total of four 7.5 MGD pumps (two existing and two new) with one 7.5 MGD pump utilized as a standby unit. Structure modification is required to accommodate placement of new pumps. An additional component is the Screening S

Status
Closed
Sector
Water Supply and Storage, Government, Waste Processing and Treatment, Power Transmission, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
Location
Atlanta, Georgia, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Utoy Creek Influent Pump Station Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Utoy Creek Influent Pump Station Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Atlanta, Georgia, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

construction documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Utoy Creek Influent Pump Station: Project consists of replacement of the two existing 4 million gallons (MGD) pumps with two 7.5 MGD pumps. The pump station capacity upgrade is a total of four 7.5 MGD pumps (two existing and two new) with one 7.5 MGD pump utilized as a standby unit. Structure modification is required to accommodate placement of new pumps. An additional component is the Screening System Improvements. This includes upgrading the mechanical screening equipment with capacity to h...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Georgia

City

Atlanta

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Waste Processing and Treatment, Power Transmission, Commercial, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2025-09-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project