Uttar Pradesh Water Sector Restructuring Project
Sector: Water Supply and Storage • Location: India
Source: World Bank
The development objectives of the Uttar Pradesh Water Sector Restructuring Project are to: a) set up an enabling institutional and policy framework for water sector reform in the State for integrated water resources management; and b) initiate irrigation and drainage sub-sector reforms in the State to increase and stain water and agricultural productivity. The project has six components: Component
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Hydro, Raw Materials, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about Uttar Pradesh Water Sector Restructuring Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objectives of the Uttar Pradesh Water Sector Restructuring Project are to: a) set up an enabling institutional and policy framework for water sector reform in the State for integrated water resources management; and b) initiate irrigation and drainage sub-sector reforms in the State to increase and stain water and agricultural productivity. The project has six components: Component 1 initiates water sector reform. Component 2 finances irrigation and drainage sub-sector reforms. Component 3 pilots reform options for integrated water resources management at the sub-basin level and Component 4 pilots reform measures for sustainable and efficient operation and management of irrigation and drainage infrastructure. Specifically, the latter component rebuilds and modernizes irrigation and drainage systems based on community priorities; supports agricultural intensification and diversification through extension services, study tours, and other training; and pilots replicable management options, including transferring management responsibilites to water user associations. Component 5 initiates topographic surveys and environmental, social, and other assessments, and prepares feasibility studies for activities to be undertaken in a follow-up project. Component 6 assists the Project Activities Core Team (PACT) with its role in facilitating and guiding the implmeentation and monitoring of all project activities, ensuring synergy and coordination. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | India |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Hydro, Raw Materials, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in India
- Kiru Hydroelectric Project Jammu and Kashmir India
- Pinnapuram Integrated Renewable Energy Project India
- Chuzachen Hydroelectric Power Project Sikkim
- Mahan I Power Project Madhya Pradesh
- Rampur Hydro Electric Power Project Himachal Pradesh
- UriII Hydroelectric Project Jammu and Kashmir
- Kakrapar Atomic Power Station Expansion
- Nathpa Jhakri India Hydroelectric Power Plant
