Uv Treatment Plant Expansion
Closed · New Mexico · Last reported Feb 2025
Source: Dodge
This project consists of the installation of UV Treatment equipment for the second UV channel, including a new system control center (SCC), hydraulic System center (HSC) and all equipment to allow independent and redundant UV treatment at the Carlsbad Wastewater Treatment Plant. This project also includes an additive bid alternate to replace the existing PLC in the existing SCC
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial)
- Location
- Carlsbad, New Mexico, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Uv Treatment Plant Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of the installation of UV Treatment equipment for the second UV channel, including a new system control center (SCC), hydraulic System center (HSC) and all equipment to allow independent and redundant UV treatment at the Carlsbad Wastewater Treatment Plant. This project also includes an additive bid alternate to replace the existing PLC in the existing SCC |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Mexico |
City | Carlsbad |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
