UVC BA Restroom Remodel
Closed · Utah · Last reported Mar 2024
Source: Dodge USA
This project is the remodeling of two spaces. One is an existing restroom and one is turning a space into a restroom. The base bid shall include all work and materials associated with this project as outlined in the plans and specifications. This work needs to be completed during the Summer Break 2024 which is May 9th through August 12th.
- Status
- Closed
- Sector
- Education, Commercial
- Location
- Orem, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about UVC BA Restroom Remodel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is the remodeling of two spaces. One is an existing restroom and one is turning a space into a restroom. The base bid shall include all work and materials associated with this project as outlined in the plans and specifications. This work needs to be completed during the Summer Break 2024 which is May 9th through August 12th. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Orem |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Education, Commercial |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
