logo
ProjectActive

UZ Solar 3

Sector: Rail • Location: Uzbekistan

Source: IFC Project Disclosures

 The proposed investment will support the development of the Nur Bukhara Solar photovoltaic (“PV”) project with a capacity of 250 MWA and 63 MW/126 MWh Battery Energy Storage System (“BESS”) in Uzbekistan (the “Project). Abu Dhabi Future Energy Company PJSC (“Masdar”) has been awarded by the Ministry of Energy, Government of Uzbekistan, to design, build, finance, construct, commission and ope

Status
Prospective
Sector
Rail, Power Transmission, Solar, Power Generation (CCGT), Energy Storage, Road, Government, Water Supply and Storage
Location
Uzbekistan
Updated
19 Nov 2026
Source
IFC Project Disclosures

ConstructChat

Ask ConstructChat about UZ Solar 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “UZ Solar 3” is an infrastructure initiative in the Rail sector, located in Uzbekistan. Taiyo aggregates data on it from IFC Project Disclosures.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

 The proposed investment will support the development of the Nur Bukhara Solar photovoltaic (“PV”) project with a capacity of 250 MWA and 63 MW/126 MWh Battery Energy Storage System (“BESS”) in Uzbekistan (the “Project). Abu Dhabi Future Energy Company PJSC (“Masdar”) has been awarded by the Ministry of Energy, Government of Uzbekistan, to design, build, finance, construct, commission and operate, maintain and transfer the Project. The Project will be implemented through a long-term, i.e., 25 years power purchase agreement, including a 10-year BESS term, between Nur Bukhara Solar PV LLC FE (the “Project Company”) and JSC National Electric Grid of Uzbekistan (“NEGU”).  The project site covers approximately 649 hectares (ha) of land in the Alat District of the Bukhara region, a region in the southwest area of the Republic of Uzbekistan. It is located 24 km southeast of Alat city, and approximately 25 km from the Turkmenistan border. The proposed site is flat and is surrounded by the Amu-Bukhara Irrigation System (ABIS) canal to the north, south and east. The regional road, R78 runs alongside the northern boundary of the site. The overhead transmission line (OHTL) connection requires the construction of two branches of 220 kV OHTLs with a total length of approximately 3km.  Project construction will be carried out by the Engineering, Procurement, and Construction (EPC) - a consortium of Jakson Ltd, Jakson Green Pvt Ltd & Rail Vikas Nigam Limited. Early works is expected to start in October 2023, while construction is expected to commence in May 2024 with a total duration of 12 months. Peak construction will be from January to March 2025. Project operations are expected to begin in August 2025. Masdar will appoint a Project Management Company (PMC) to supervise activities of the construction phase.

Original sector

V-BF - Solar - Renewable Energy Generation

Location

Country

Uzbekistan

Source

Source

IFC Project Disclosures

URL

More Details

Record type

Project

Sector

Rail, Power Transmission, Solar, Power Generation (CCGT), Energy Storage, Road, Government, Water Supply and Storage

Article published date

2026-09-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project