UZ Solar 3
The status, timeline and source of this project. A free account opens every field.
Source: International Finance Corporation (IFC)
The proposed investment will support the development of the Nur Bukhara Solar photovoltaic (“PV”) project with a capacity of 250 MWA and 63 MW/126 MWh Battery Energy Storage System (“BESS”) in Uzbekistan (the “Project). Abu Dhabi Future Energy Company PJSC (“Masdar”) has been awarded by the Ministry of Energy, Government of Uzbekistan, to design, build, finance, construct, commission and operate,
- Status
- Prospective
- Sector
- Water Supply and Storage, Solar, Waste Processing and Treatment, Energy Storage, Wind, Rail, Road, Warehouse, Power Generation (CCGT), Power Transmission, Government
- Location
- Uzbekistan
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about UZ Solar 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed investment will support the development of the Nur Bukhara Solar photovoltaic (“PV”) project with a capacity of 250 MWA and 63 MW/126 MWh Battery Energy Storage System (“BESS”) in Uzbekistan (the “Project). Abu Dhabi Future Energy Company PJSC (“Masdar”) has been awarded by the Ministry of Energy, Government of Uzbekistan, to design, build, finance, construct, commission and operate, maintain and transfer the Project. The Project will be implemented through a long-term, i.e., 25 years power purchase agreement, including a 10-year BESS term, between Nur Bukhara Solar PV LLC FE (the “Project Company”) and JSC National Electric Grid of Uzbekistan (“NEGU”). The project site covers approximately 649 hectares (ha) of land in the Alat District of the Bukhara region, a region in the southwest area of the Republic of Uzbekistan. It is located 24 km southeast of Alat city, and approximately 25 km from the Turkmenistan border. The proposed site is flat and is surrounded by the Amu-Bukhara Irrigation System (ABIS) canal to the north, south and east. The regional road, R78 runs alongside the northern boundary of the site. The overhead transmission line (OHTL) connection requires the construction of two branches of 220 kV OHTLs with a total length of approximately 3km. Project construction will be carried out by the Engineering, Procurement, and Construction (EPC) - a consortium of Jakson Ltd, Jakson Green Pvt Ltd & Rail Vikas Nigam Limited. Early works is expected to start in October 2023, while construction is expected to commence in May 2024 with a total duration of 12 months. Peak construction will be from January to March 2025. Project operations are expected to begin in August 2025. Masdar will appoint a Project Management Company (PMC) to supervise activities of the construction phase. |
Original sector | V-BF - Solar - Renewable Energy Generation |
Location
Country | Uzbekistan |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Solar, Waste Processing and Treatment, Energy Storage, Wind, Rail, Road, Warehouse, Power Generation (CCGT), Power Transmission, Government |
Article published date | 2026-01-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Uzbekistan
- Fergana Refinery Modernisation
- UZBEKISTAN WATER FRAMEWORK LOAN
- Sirdarya CCGT Power Plant Shirin
- Tashkent water improvement contract
- Bukhara & Samarkand water supply project
- Uzbekistan: Surkhandarya 1,560MW CCGT Power Plant
- Uzbekistan: Bukhara Road Network Improvement Project Phase 2
- Uzbekistan: Karakalpakstan and Khorezm Water Supply and Sanitation Project
