logo
ProjectProposed

Uzbekistan: Bash 2 - 300MW Wind Power Plant

Proposed · Uzbekistan

Source: Asian Infrastructure Investment Bank (AIIB)

The Project involves the development, construction, and operation of a wind power plant of 300MW capacity and Purchaser Electrical Facilities, including a 1.5 km of single circuit of 500kV Overhead Transmission Line (OHTL) connecting to existing Bash-Karakul OHTL, as well as 500kV switching station. The proposed site is located in the Gijduvan district of the Bukhara region in southern Uzbekistan.

Status
Prospective
Sector
Chemical (Industrial), Power Transmission, Warehouse, Wind, Natural Gas, Telecommunications, Road, Power Generation (CCGT), Raw Materials, Government, Residential, Manufacturing (Industrial), Commercial
Location
Uzbekistan
Updated
22 Jul 2026
Source
Asian Infrastructure Investment Bank (AIIB)

ConstructChat

Ask ConstructChat about Uzbekistan: Bash 2 - 300MW Wind Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Uzbekistan: Bash 2 - 300MW Wind Power Plant” is an infrastructure initiative in the Chemical (Industrial) sector, located in Uzbekistan. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Participants

Sponsoring Agency

Company

Status

Original status

proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project involves the development, construction, and operation of a wind power plant of 300MW capacity and Purchaser Electrical Facilities, including a 1.5 km of single circuit of 500kV Overhead Transmission Line (OHTL) connecting to existing Bash-Karakul OHTL, as well as 500kV switching station. The proposed site is located in the Gijduvan district of the Bukhara region in southern Uzbekistan. This project will be co-financed with ADB and other commercial banks. A 25-year PPA was directly negotiated and signed in November 2023 with the National Electric Grid of Uzbekistan (NEGU) as the offtaker. The Investment Agreement (IA) with the Ministry of Investments, Industry and Trade on behalf of the Government of Uzbekistan (GoU) was also signed in November 2023.

Original sector

Energy

Budget

Location

Country

Uzbekistan

Source

Source

Asian Infrastructure Investment Bank (AIIB)

URL

More Details

Record type

Project

Sector

Chemical (Industrial), Power Transmission, Warehouse, Wind, Natural Gas, Telecommunications, Road, Power Generation (CCGT), Raw Materials, Government, Residential, Manufacturing (Industrial), Commercial

Article published date

2025-12-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project