logo

Uzbekistan: Bukhara Road Network Improvement Project Phase 2

Sector: Water Supply and Storage • Location: Uzbekistan

Source: Asian Infrastructure Investment Bank (AIIB)

Project
Proposed

The Bukhara Road Network Improvement Project Phase 2 (the Program) aims to reconstruct and upgrade critical sections of the M37 international road corridor, covering approximately 160 kilometers (km) from km 207 to km 365 in the Bukhara Region of Uzbekistan. The M37 corridor is a strategic cross-border route, connecting major urban centers such as Samarkand and Bukhara to the border with Turkmenis

Project Information FAQ

Project Information

5 Q
The project “Uzbekistan: Bukhara Road Network Improvement Project Phase 2” is an infrastructure initiative in the Water Supply and Storage sector, located in Uzbekistan. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

proposed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Bukhara Road Network Improvement Project Phase 2 (the Program) aims to reconstruct and upgrade critical sections of the M37 international road corridor, covering approximately 160 kilometers (km) from km 207 to km 365 in the Bukhara Region of Uzbekistan. The M37 corridor is a strategic cross-border route, connecting major urban centers such as Samarkand and Bukhara to the border with Turkmenistan, and, thereby, facilitating enhanced regional trade and connectivity. The Program will finance the following activities: (i) civil works for the rehabilitation of approximately 160km of M37 road sections with cement concrete pavement; (ii) consultancy services for construction supervision and technical audit; (iii) design, supply, and installation of Intelligent Transport System (ITS) components along the rehabilitated corridor; and (iv) institutional strengthening and capacity building. Under the proposed MPP framework, the Program will be structured as follows: Tranche-1 Project (the Project): Reconstruction of road sections from km 311 to km 346 (Lot 4) and from km 346 to km 365 (Lot 5), with a proposed financing amount of approximately USD150 million. Tranche-2 Project: Reconstruction of the remaining road sections from km 207 to km 311, covering Lots 1, 2, and 3. This sub-project will be prepared and submitted for President approval in a subsequent phase. The BRNIP Phase 2 builds on BRNIP Phase 1 (P000313), which was approved by AIIB's Board on December 8, 2021, and became effective on May 11, 2022. The objective of Phase 1 is to improve transport connectivity and road safety in the Bukhara Region. The project supports the reconstruction of 78 kilometers of road sections of the A380 international highway. As of May 2025, all three civil works contracts are under implementation, and key safeguards and procurement activities are being carried out in accordance with the agreed implementation plan.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data