Uzbekistan: Bukhara Road Network Improvement Project Phase 2
One of 10,000+ projects Taiyo tracks in Uzbekistan.
Source: Asian Infrastructure Investment Bank (AIIB)
The Bukhara Road Network Improvement Project Phase 2 (the Program) aims to reconstruct and upgrade critical sections of the M37 international road corridor, covering approximately 160 kilometers (km) from km 207 to km 365 in the Bukhara Region of Uzbekistan. The M37 corridor is a strategic cross-border route, connecting major urban centers such as Samarkand and Bukhara to the border with Turkmenis
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Transmission, Road, Hospital, Cement, Consumer Products, Power Generation (CCGT), Raw Materials, Residential, Commercial, Government
- Location
- Uzbekistan
- Updated
- 22 Jul 2026
- Source
- Asian Infrastructure Investment Bank (AIIB)
ConstructChat
Ask ConstructChat about Uzbekistan: Bukhara Road Network Improvement Project Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | proposed |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Bukhara Road Network Improvement Project Phase 2 (the Program) aims to reconstruct and upgrade critical sections of the M37 international road corridor, covering approximately 160 kilometers (km) from km 207 to km 365 in the Bukhara Region of Uzbekistan. The M37 corridor is a strategic cross-border route, connecting major urban centers such as Samarkand and Bukhara to the border with Turkmenistan, and, thereby, facilitating enhanced regional trade and connectivity. The Program will finance the following activities: (i) civil works for the rehabilitation of approximately 160km of M37 road sections with cement concrete pavement; (ii) consultancy services for construction supervision and technical audit; (iii) design, supply, and installation of Intelligent Transport System (ITS) components along the rehabilitated corridor; and (iv) institutional strengthening and capacity building. Under the proposed MPP framework, the Program will be structured as follows: Tranche-1 Project (the Project): Reconstruction of road sections from km 311 to km 346 (Lot 4) and from km 346 to km 365 (Lot 5), with a proposed financing amount of approximately USD150 million. Tranche-2 Project: Reconstruction of the remaining road sections from km 207 to km 311, covering Lots 1, 2, and 3. This sub-project will be prepared and submitted for President approval in a subsequent phase. The BRNIP Phase 2 builds on BRNIP Phase 1 (P000313), which was approved by AIIB's Board on December 8, 2021, and became effective on May 11, 2022. The objective of Phase 1 is to improve transport connectivity and road safety in the Bukhara Region. The project supports the reconstruction of 78 kilometers of road sections of the A380 international highway. As of May 2025, all three civil works contracts are under implementation, and key safeguards and procurement activities are being carried out in accordance with the agreed implementation plan. |
Original sector | Transport |
Budget |
Location
Country | Uzbekistan |
Source
Source | Asian Infrastructure Investment Bank (AIIB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Road, Hospital, Cement, Consumer Products, Power Generation (CCGT), Raw Materials, Residential, Commercial, Government |
Article published date | 2025-12-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Uzbekistan
- Fergana Refinery Modernisation
- UZBEKISTAN WATER FRAMEWORK LOAN
- Sirdarya CCGT Power Plant Shirin
- Tashkent water improvement contract
- Bukhara & Samarkand water supply project
- Uzbekistan: Surkhandarya 1,560MW CCGT Power Plant
- Uzbekistan: Karakalpakstan and Khorezm Water Supply and Sanitation Project
- Uzbekistan: Accelerating the Uzbekistan Climate Transition for Green, Inclusive, and Resilient Economic Growth (Subprogram 1)