logo
ProjectApproved

Uzbekistan: Nukus II 200MW Wind and BESS Project

Sector: Water Supply and Storage • Location: Uzbekistan

Source: Asian Infrastructure Investment Bank (AIIB)

The project involves the development, construction, and operation of a wind power plant of 200MW capacity, a 100MWhr Battery Energy Storage System (BESS), expansion of a 220kV switching station and 2x42 km double circuit 220kV Overhead Transmission Line (OHTL) connecting to an existing grid substation. The proposed project site is in the Karatau mountain region in Beruniy and Qorao'zak Districts i

Status
Prospective
Sector
Water Supply and Storage, Chemical (Industrial), Power Transmission, Automotive, Biomass, Wind, Road, Power Generation (CCGT), Raw Materials, Energy Storage, Waste Processing and Treatment, Government, Rail, Residential, Manufacturing (Industrial), Commercial
Location
Uzbekistan
Updated
22 Jul 2026
Source
Asian Infrastructure Investment Bank (AIIB)

ConstructChat

Ask ConstructChat about Uzbekistan: Nukus II 200MW Wind and BESS Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Uzbekistan: Nukus II 200MW Wind and BESS Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Uzbekistan. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Participants

Sponsoring Agency

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the development, construction, and operation of a wind power plant of 200MW capacity, a 100MWhr Battery Energy Storage System (BESS), expansion of a 220kV switching station and 2x42 km double circuit 220kV Overhead Transmission Line (OHTL) connecting to an existing grid substation. The proposed project site is in the Karatau mountain region in Beruniy and Qorao'zak Districts in Karakalpakstan, Northwestern Uzbekistan. A 25-year PPPA has been awarded to ACWA through a competitive tender and signed on March 28, 2024, with the National Electric Grid of Uzbekistan (NEGU) as the Public Partner (off taker). A project SPV - Private Partner (ACWA Power Beruniy Wind FE LLC) has been established and will serve as the borrower for the respective plant.

Original sector

Energy

Budget

Location

Country

Uzbekistan

Source

Source

Asian Infrastructure Investment Bank (AIIB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Chemical (Industrial), Power Transmission, Automotive, Biomass, Wind, Road, Power Generation (CCGT), Raw Materials, Energy Storage, Waste Processing and Treatment, Government, Rail, Residential, Manufacturing (Industrial), Commercial

Article published date

2025-12-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project