Uzbekistan Power Transmission Improvement Project
One of 10,000+ projects Taiyo tracks in Uzbekistan.
Source: Asian Development Bank (ADB)
The project aims to (i) improve power transmission network capacity and reliability in the northwest region of the country, the Karakalpakstan and Khorezm regions; (ii) reduce transmission losses; and (iii) improve the operational efficiency of the power sector. The project components include (a) the construction of a 220 kilovolt (kV) single-circuit overhead transmission line approximately 364 ki
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Residential, Power Generation (CCGT), Manufacturing (Industrial), Government, Geothermal, Hydro, Wind, Commercial
- Location
- Uzbekistan
- Updated
- 22 Jul 2026
- Source
- Asian Development Bank (ADB)
ConstructChat
Ask ConstructChat about Uzbekistan Power Transmission Improvement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project aims to (i) improve power transmission network capacity and reliability in the northwest region of the country, the Karakalpakstan and Khorezm regions; (ii) reduce transmission losses; and (iii) improve the operational efficiency of the power sector. The project components include (a) the construction of a 220 kilovolt (kV) single-circuit overhead transmission line approximately 364 kilometers (km) in length, (b) the expansion, rehabilitation and construction of 3 substations, and (c) institutional development, capacity building and project management. |
Original sector | Energy |
Budget |
Location
Country | Uzbekistan |
Source
Source | Asian Development Bank (ADB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Residential, Power Generation (CCGT), Manufacturing (Industrial), Government, Geothermal, Hydro, Wind, Commercial |
Article published date | 2025-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Uzbekistan
- Fergana Refinery Modernisation
- UZBEKISTAN WATER FRAMEWORK LOAN
- Sirdarya CCGT Power Plant Shirin
- Tashkent water improvement contract
- Bukhara & Samarkand water supply project
- Uzbekistan: Surkhandarya 1,560MW CCGT Power Plant
- Uzbekistan: Bukhara Road Network Improvement Project Phase 2
- Uzbekistan: Karakalpakstan and Khorezm Water Supply and Sanitation Project
