Uzbekistan: Rural Infrastructure Development Project – 2 (RIDP-2)
Sector: Waste Processing and Treatment • Location: Uzbekistan
Source: aiib
Project name: Rural Infrastructure Development Project 2 (Project, RIDP 2) – Results Based Financing Project The proposed Project aims to address localized infrastructure gaps in Uzbekistan’s rural communities (mahallas) most deprived of access to basic infrastructure services by strengthening government systems for participatory planning and enhancing local infrastructure investments. RIDP-2 buil
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Biomass, Bridge, Government, Water Supply and Storage, Road
- Location
- Uzbekistan
- Updated
- 19 Nov 2026
- Source
- aiib
ConstructChat
Ask ConstructChat about Uzbekistan: Rural Infrastructure Development Project – 2 (RIDP-2)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | proposed |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Project name: Rural Infrastructure Development Project 2 (Project, RIDP 2) – Results Based Financing Project The proposed Project aims to address localized infrastructure gaps in Uzbekistan’s rural communities (mahallas) most deprived of access to basic infrastructure services by strengthening government systems for participatory planning and enhancing local infrastructure investments. RIDP-2 builds on the experience of the joint World Bank (WB) and AIIB Rural Infrastructure Development Project (RIDP-1). RIDP-1 helped develop and test mechanisms for community-driven development, performance-based incentives, and the use of strengthened country systems at scale. RIDP-2 aims to ensure that proposed infrastructure investments are demand-driven and directly respond to local needs while strengthening transparency, accountability, and local ownership through existing Mahalla structures. The Project will focus on six regions (Andijan, Ferghana, Jizzakh, Namangan, Syrdaria, and Tashkent region) targeting 296 mahallas across 38 districts that have been selected based on infrastructure gaps, poverty and vulnerability indicators, and economic potential. The Project will finance investments in basic local infrastructure within selected mahallas, including climate-resilient social infrastructure (schools, health facilities, community centers), water and sanitation systems, local roads and transport improvements, micro-scale solid waste management, street lighting and energy efficiency measures. Sub project selection will be carried out through participatory Mahalla Development Plans, where communities through Mahalla Development Units and other existing institutionalized Mahalla-level structures will identify and prioritize investments aligned with district strategies and sector policies. Based on the lessons from successful implementation of RIDP-1 and strengthened country systems, RIDP-2 will be designed using the Results-Based Financing (RBF) Modality and is expected to be processed as co-financing with the WB Program-for-Results, to bridge the financing gap under the broader Government Program. AIIB will co-finance formula-driven allocations to scale rural infrastructure development. The Project represents a shift from a project-based intervention toward a system-oriented framework that integrates local-level priorities into national planning, budgeting, and public investment management systems, while improving access and quality of public infrastructure. |
Original sector | Multi-sector |
Budget |
Location
Country | Uzbekistan |
Source
Source | aiib |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Biomass, Bridge, Government, Water Supply and Storage, Road |
Article published date | 2026-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Uzbekistan
- UZBEKISTAN WATER FRAMEWORK LOAN
- Tashkent water improvement contract
- Bukhara & Samarkand water supply project
- Uzbekistan: Karakalpakstan and Khorezm Water Supply and Sanitation Project
- Skills Development for a Modern Economy Project
- Uzbekistan: Karakalpakstan and Khorezm Local Roads Network Reconstruction Project
- Uzbekistan: CEEC Uzbekistan BESS Green Loan
- Uzbekistan: Bukhara Region Water Supply and Sewerage Phase II (BRWSSP II)
