logo
ProjectProposed

Uzbekistan: Rural Infrastructure Development Project – 2 (RIDP-2)

Sector: Waste Processing and Treatment • Location: Uzbekistan

Source: aiib

Project name: Rural Infrastructure Development Project 2 (Project, RIDP 2) – Results Based Financing Project The proposed Project aims to address localized infrastructure gaps in Uzbekistan’s rural communities (mahallas) most deprived of access to basic infrastructure services by strengthening government systems for participatory planning and enhancing local infrastructure investments. RIDP-2 buil

Status
Prospective
Sector
Waste Processing and Treatment, Biomass, Bridge, Government, Water Supply and Storage, Road
Location
Uzbekistan
Updated
19 Nov 2026
Source
aiib

ConstructChat

Ask ConstructChat about Uzbekistan: Rural Infrastructure Development Project – 2 (RIDP-2)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Uzbekistan: Rural Infrastructure Development Project – 2 (RIDP-2)” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Uzbekistan. Taiyo aggregates data on it from aiib.

Participants

Not available for this record.

Status

Original status

proposed

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Project name: Rural Infrastructure Development Project 2 (Project, RIDP 2) – Results Based Financing Project The proposed Project aims to address localized infrastructure gaps in Uzbekistan’s rural communities (mahallas) most deprived of access to basic infrastructure services by strengthening government systems for participatory planning and enhancing local infrastructure investments. RIDP-2 builds on the experience of the joint World Bank (WB) and AIIB Rural Infrastructure Development Project (RIDP-1). RIDP-1 helped develop and test mechanisms for community-driven development, performance-based incentives, and the use of strengthened country systems at scale. RIDP-2 aims to ensure that proposed infrastructure investments are demand-driven and directly respond to local needs while strengthening transparency, accountability, and local ownership through existing Mahalla structures. The Project will focus on six regions (Andijan, Ferghana, Jizzakh, Namangan, Syrdaria, and Tashkent region) targeting 296 mahallas across 38 districts that have been selected based on infrastructure gaps, poverty and vulnerability indicators, and economic potential. The Project will finance investments in basic local infrastructure within selected mahallas, including climate-resilient social infrastructure (schools, health facilities, community centers), water and sanitation systems, local roads and transport improvements, micro-scale solid waste management, street lighting and energy efficiency measures. Sub project selection will be carried out through participatory Mahalla Development Plans, where communities through Mahalla Development Units and other existing institutionalized Mahalla-level structures will identify and prioritize investments aligned with district strategies and sector policies. Based on the lessons from successful implementation of RIDP-1 and strengthened country systems, RIDP-2 will be designed using the Results-Based Financing (RBF) Modality and is expected to be processed as co-financing with the WB Program-for-Results, to bridge the financing gap under the broader Government Program. AIIB will co-finance formula-driven allocations to scale rural infrastructure development. The Project represents a shift from a project-based intervention toward a system-oriented framework that integrates local-level priorities into national planning, budgeting, and public investment management systems, while improving access and quality of public infrastructure.

Original sector

Multi-sector

Budget

Location

Country

Uzbekistan

Source

Source

aiib

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Biomass, Bridge, Government, Water Supply and Storage, Road

Article published date

2026-10-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project