Uzbekistan: Rural Infrastructure Development Project (Previously: Prosperous Villages Project)
The status, timeline and source of this project. A free account opens every field.
Source: Asian Infrastructure Investment Bank (AIIB)
This is a multi-sectoral rural infrastructure project. The project has the following two components. Component 1: Demand-driven Investments in Basic Infrastructure and Services. The Project will finance sub-projects comprising investments in basic infrastructure and services which will be planned and prioritized jointly by participating district administrations and communities. The types of invest
- Status
- Prospective
- Sector
- Water Supply and Storage, Rail, Bridge, Manufacturing (Industrial), Road, Raw Materials, Government, Residential, Commercial
- Location
- Uzbekistan
- Updated
- 22 Jul 2026
- Source
- Asian Infrastructure Investment Bank (AIIB)
ConstructChat
Ask ConstructChat about Uzbekistan: Rural Infrastructure Development Project (Previously: Prosperous Villages Project)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This is a multi-sectoral rural infrastructure project. The project has the following two components. Component 1: Demand-driven Investments in Basic Infrastructure and Services. The Project will finance sub-projects comprising investments in basic infrastructure and services which will be planned and prioritized jointly by participating district administrations and communities. The types of investments will include: access to water supply for drinking, irrigation, and agricultural production; sanitation services; rehabilitation of social facilities; rehabilitation of roads, footpaths and bridges; rural electrification, and energy efficiency improvements. Investments are subject to a negative list that includes housing construction and renovation or any investments that require physical displacement or resettlement of people. Component 2: Project Management, Monitoring and Evaluation, and Institutional Support. This component will support a project implementation structure within the Ministry of Economic Development and Poverty Reduction (MoEDPR). The component will provide financing for operational costs, consultants, essential equipment, technical assistance, and training. Funding will also be provided for information dissemination, beneficiary assessments, periodic surveys, monitoring and evaluation (M&E) activities, a management information system (MIS), project audits, and a project-level grievance redress mechanism (GRM) that will handle grievances. |
Original sector | Rural Infrastructure and Agriculture Development |
Budget |
Location
Country | Uzbekistan |
Source
Source | Asian Infrastructure Investment Bank (AIIB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Rail, Bridge, Manufacturing (Industrial), Road, Raw Materials, Government, Residential, Commercial |
Article published date | 2025-12-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Uzbekistan
- Fergana Refinery Modernisation
- UZBEKISTAN WATER FRAMEWORK LOAN
- Sirdarya CCGT Power Plant Shirin
- Tashkent water improvement contract
- Bukhara & Samarkand water supply project
- Uzbekistan: Surkhandarya 1,560MW CCGT Power Plant
- Uzbekistan: Bukhara Road Network Improvement Project Phase 2
- Uzbekistan: Karakalpakstan and Khorezm Water Supply and Sanitation Project
