logo

Uzbekistan: Surkhandarya 1,560MW CCGT Power Plant

Sector: Water Supply and Storage • Location: Uzbekistan

Source: Asian Infrastructure Investment Bank (AIIB)

Project
Approved

The Project involves the design, construction, maintenance and operation of a greenfield combined-cycle gas turbine (CCGT) power plant of 1,590MW capacity and associated infrastructure in Surkhandarya region in Uzbekistan. The Project is being developed by Stone City Energy (SCE, 25%), EDF (15%), Siemens Energy (25%) and Nebras Power (35%), through a dedicated project company SCE-Quvvat LLC. Consi

Project Information FAQ

Project Information

5 Q
The project “Uzbekistan: Surkhandarya 1,560MW CCGT Power Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in Uzbekistan. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

approved

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project involves the design, construction, maintenance and operation of a greenfield combined-cycle gas turbine (CCGT) power plant of 1,590MW capacity and associated infrastructure in Surkhandarya region in Uzbekistan. The Project is being developed by Stone City Energy (SCE, 25%), EDF (15%), Siemens Energy (25%) and Nebras Power (35%), through a dedicated project company SCE-Quvvat LLC. Consistent with the Uzbekistan Ministry of Energy's “Concept note for ensuring the electricity supply in Uzbekistan in 2020-2030”, the Project is supported by a 25-years Power Purchase Agreement (PPA) signed between SCE-Quvvat and JSC National Electric Grid of Uzbekistan in April 2021, as amended and restated in May 2023. The Project is developed using Siemens Energy's SGT5-9000HL turbines with baseload efficiency of more than 60 percent. The Project is expected to be operational in January 2027.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data