VA Tucson CMOP Covered Parking Canopies Solar PV System
Sector: Solar • Location: Tucson, Arizona, United States of America
Source: Dodge
The phased work for this project involves the construction of new parking canopies with solar photo-voltaic panels at the roof panel level - Trades Required: Utility Locator, Material Testing, Commissioning, SWPPP, Surveyor, Demolition, Site Demolition, CIP Concrete, Structural Steel, Steel Decking, Misc. Metal Fabrications, Joint Sealants, Painting, Metal Canopies, Electrical, Communications, Ele
- Status
- Closed
- Sector
- Solar, Cement, Steel, Metal, Road, Power Generation (CCGT), Power Transmission, Manufacturing (Industrial), Commercial, Car parking, Automotive
- Location
- Tucson, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about VA Tucson CMOP Covered Parking Canopies Solar PV System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The phased work for this project involves the construction of new parking canopies with solar photo-voltaic panels at the roof panel level - Trades Required: Utility Locator, Material Testing, Commissioning, SWPPP, Surveyor, Demolition, Site Demolition, CIP Concrete, Structural Steel, Steel Decking, Misc. Metal Fabrications, Joint Sealants, Painting, Metal Canopies, Electrical, Communications, Electronic Safety & Security, Video Surveillance, Earthwork, Site Concrete, Asphalt Paving (patching... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Tucson |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Solar, Cement, Steel, Metal, Road, Power Generation (CCGT), Power Transmission, Manufacturing (Industrial), Commercial, Car parking, Automotive |
Article published date | 2025-09-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in United States of America
- William and Linda Frost Center for Research and Innovation
- INSTALL (27) 360W MODULES AT 9.72 KW TOTAL.
- ROOF MOUNT PV SYSTEM: (16) 335W MODULES AT 5.36 KW TOTAL
- AS PER MASTER PV PERMIT 202103084 SOHAY LINE BUILDING 20 UNIT 240 (7) MODULE 2.45 KW SYSTEM
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 3.19 KW 9 PANELS
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 5.1 KW 12 MODULES
- 9.8 KW PV (37) MODULE SOLAR ROOFTOP INSTALLATION GARAGE INSTEAD OF THE EXTERIOR
- PV SOLAR ROOF MOUNT INSTALLATION: (11) 400W MODULES AT 4.4 K W TOTAL.
