logo
ProjectCompleted

VAALCO Offshore Gabon Oilfield Development Project

Sector: Water Supply and Storage • Location: Gabon

Source: International Finance Corporation (IFC)

 The project involves the development of the Etame field in the Etame Marin block, 45 km offshore of the southern coast of Gabon, by VAALCO Energy, a publicly traded oil company based in Houston. VAALCO estimates proved reserves of 40.5 million barrels and proved and probable reserves of 65 million barrels. VAALCO has also identified two other fields within the block (North and South Tchibala)

Status
Closed
Sector
Water Supply and Storage, Government, Oil and Gas
Location
Gabon
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about VAALCO Offshore Gabon Oilfield Development Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “VAALCO Offshore Gabon Oilfield Development Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Gabon. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the development of the Etame field in the Etame Marin block, 45 km offshore of the southern coast of Gabon, by VAALCO Energy, a publicly traded oil company based in Houston. VAALCO estimates proved reserves of 40.5 million barrels and proved and probable reserves of 65 million barrels. VAALCO has also identified two other fields within the block (North and South Tchibala) with attractive reservoir properties and has indicated an interest in pursuing a potential second phase of the project. The project will involve the completion of the four existing wells, the drilling and testing of two additional wells and the installation of subsea wellheads at a cost of $65 million. The first three wells will be completed during 3rd quarter 2002 with the remaining wells completed in 2003. VAALCO will also lease a floating production, storage and offloading vessel (FPSO) with a capacity of 30,000 bbl/d. The total project costs, including $33 million of prior capital investment, amount to $98 million. IFC is contemplating lending up to $18 million, comprising an A and B Loan of $9 million each, to fund VAALCO’s contribution to future costs.

Original sector

AB - Oil and Gas Production (Includes Development)

Location

Country

Gabon

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Oil and Gas

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project