Vadodara 100 MW Solar Power Project
Sector: Water Supply and Storage • Location: Vadodara, Gujarat, India
Source: SME Street
Avaada Group laid the foundation stone for a 100 MW solar power project in Vadodara district, Gujarat. The project covers 350 acres, involves an investment of ₹400 crore, and is expected to be commissioned by April 2026. It aims to reduce CO₂ emissions and conserve water through advanced robotic module cleaning technology.
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Generation (CCGT), Solar, Road
- Location
- Vadodara, Gujarat, India
- Updated
- 22 Jul 2026
- Source
- SME Street
ConstructChat
Ask ConstructChat about Vadodara 100 MW Solar Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Avaada Group laid the foundation stone for a 100 MW solar power project in Vadodara district, Gujarat. The project covers 350 acres, involves an investment of ₹400 crore, and is expected to be commissioned by April 2026. It aims to reduce CO₂ emissions and conserve water through advanced robotic module cleaning technology. |
Original sector | Renewable Energy |
Budget |
Location
Country | India |
State | Gujarat |
City | Vadodara |
Source
Source | SME Street |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Solar, Road |
Article published date | 2025-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
