VA/DOT: Rte 15 Evergreen Mill Road Widening
Sector: Water Supply and Storage • Location: Leesburg, Virginia, United States of America
Source: Dodge
Widen approximately one mile of Evergreen Mill Road from the southern Leesburg corporate limits at Battlefield Parkway to South King Street (Route 15). The existing two-lane road will be widened to a four-lanestreet with sidewalk on one side and a shared use path on the other side. The project will include utility relocations, curb, gutter, andstorm drainage.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Planning Schematics |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Widen approximately one mile of Evergreen Mill Road from the southern Leesburg corporate limits at Battlefield Parkway to South King Street (Route 15). The existing two-lane road will be widened to a four-lanestreet with sidewalk on one side and a shared use path on the other side. The project will include utility relocations, curb, gutter, andstorm drainage. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
