VA/DOT: Rte 622 2 Culvert Replacements
Sector: Water Supply and Storage • Location: Virginia, United States of America
Source: Dodge USA
Culvert Replacements Roanoke County Find out about a project to replace two drainage culverts in Roanoke County. The first culvert is located on Route 622 Bradshaw Road and crosses Mason Creek. This culvert is located 5.63 miles from Route 727 Berrybrook Drive and 2.9 miles from Route 873 Green Acres Drive. The second culvert is on Route 943 Branch Road and crosses a branch of Back Creek. This cul
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Commercial
- Location
- Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about VA/DOT: Rte 622 2 Culvert Replacements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Culvert Replacements Roanoke County Find out about a project to replace two drainage culverts in Roanoke County. The first culvert is located on Route 622 Bradshaw Road and crosses Mason Creek. This culvert is located 5.63 miles from Route 727 Berrybrook Drive and 2.9 miles from Route 873 Green Acres Drive. The second culvert is on Route 943 Branch Road and crosses a branch of Back Creek. This culvert is located 0.05 mile from Route 731 Lewis Road and 0.1 mile from the end of state maintenanc... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
