logo
ProjectPlanning Schematics

VA/DOT: Rte 812 Bridge Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

#SGR25VB RTE. 812 OVER STREAM (FED ID 23815) CULVERT REPLAC FROM: 0.02 MI TO ROUTE 871 TO: 0.05 MI TO END OF STATE MAINTENANCE Bridge Replacement w/o Added Capacity Route 0812 Street RED STONE DRIVE Length 0.0100 MI

Status
Prospective
Sector
Water Supply and Storage, Bridge, Waste Processing and Treatment, Road, Commercial
Location
Duffield, Virginia, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about VA/DOT: Rte 812 Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “VA/DOT: Rte 812 Bridge Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Duffield, Virginia, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

planning schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

#SGR25VB RTE. 812 OVER STREAM (FED ID 23815) CULVERT REPLAC FROM: 0.02 MI TO ROUTE 871 TO: 0.05 MI TO END OF STATE MAINTENANCE Bridge Replacement w/o Added Capacity Route 0812 Street RED STONE DRIVE Length 0.0100 MI

Procurement method

Budget

Location

Country

United States of America (USA)

State

Virginia

City

Duffield

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Bridge, Waste Processing and Treatment, Road, Commercial

Article published date

2025-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project