logo
ProjectClosed

VA/DOT: Staunton District Bridge Bundle Replacement

Closed · Virginia · Last reported Jul 2025

Source: Dodge

Design-build services for the Staunton District Bridge Bundle Project. he Staunton District Bridge Bundle includes complete bridge replacements of Route U000 over Jackson River, Route 159 (1037) over Dunlap Creek, and Route 159 (1039) over Dunlap Creek; complete culvert replacement of Route 39 over Guys Run; and superstructure only replacement of Route 707 over North Fork of the Shenandoah River.

Status
Closed
Sector
Water Supply and Storage, Road, Waste Processing and Treatment, Bridge, Commercial
Location
Covington, Virginia, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about VA/DOT: Staunton District Bridge Bundle Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “VA/DOT: Staunton District Bridge Bundle Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Covington, Virginia, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Design-build services for the Staunton District Bridge Bundle Project. he Staunton District Bridge Bundle includes complete bridge replacements of Route U000 over Jackson River, Route 159 (1037) over Dunlap Creek, and Route 159 (1039) over Dunlap Creek; complete culvert replacement of Route 39 over Guys Run; and superstructure only replacement of Route 707 over North Fork of the Shenandoah River. The proposed project will replace three structurally deficient bridges with new bridges, replace ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Virginia

City

Covington

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Waste Processing and Treatment, Bridge, Commercial

Article published date

2025-07-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project